CONTACT US
PHONE: 877.292.2343
EMAIL: INFO@AMERICANDG.COM
Linked In TwitterFacebook

CONTACT US
PHONE: 877.292.2343
EMAIL: INFO@AMERICANDG.COM
Linked In TwitterFacebook

News Releases

Two Menzies Hotels Saving with EuroSite Power
First Two of Seven Hotel Contract Now Saving with Zero Capital Outlay
EUSP

WALTHAM, Mass. – November 6, 2014 – EuroSite Power Inc., (OTCQB: EUSP) an On-Site Utility solutions provider, offering clean electricity, heat, hot water and cooling solutions to hospitality, healthcare, housing and leisure centres in the United Kingdom (UK) and Europe, is now operating combined heat and power (CHP) systems at two Menzies hotels owned by Topland Group.

An 80kW unit at Menzies Aberdeen and a 160kW unit at Menzies Derby are the first to go live from a seven hotel contract signed in April 2014. Under the terms of the 15 year agreement reached with hotel owners Topland Group, a total of 860 kW from seven modules of highly efficient combined heat and power (CHP) systems are being installed, owned and operated by EuroSite Power at seven of Topland’s UK hotels – Aberdeen, Bournemouth, Cambridge, Derby, Glasgow, Irvine and Stratford upon Avon. Together the CHP systems installed will produce up to 11,255,330kWh of total energy per annum, while saving up to 2,034 tonnes of CO2 – equivalent to taking 428 cars off the road each year.

Topland Group is one of the largest privately owned international investment groups whose principal activity is Commercial Real Estate, with a portfolio of over 270 properties, valued in the region of £4 billion. Topland has a strong track record of investing in the hotel sector. Investments include The Royal Crescent Hotel in Bath, a portfolio of Hilton Hotels, Thistle Hotels, the Welcome Break in North London, the Hallmark Hotel Group and the Menzies Hotel Group.

Lionel Benjamin, Director - Hotels for Topland Group, said: “Keeping our operating costs under control is fundamental and with EuroSite Power now operating two of their CHP systems we will start to see immediate savings especially as there was zero upfront capital cost.”

Paul Hamblyn, Managing Director of EuroSite Power, said: “We are pleased to announce that two of the units delivered under the seven hotel contract are now live. Each hotel is now saving real cash while also achieving a lower carbon footprint. The other installations are all progressing well and we plan to ensure each of the other properties are operating in time to maximize the benefit this winter.”

On-Site Utility

EuroSite Power sells the energy produced from an onsite energy system to an individual property as an alternative to the outright sale of energy equipment. On-Site Utility™ solution customers only pay for the energy produced by the system and receive a guaranteed discount rate on the price of the energy. All system capital, installation, operating expenses and support are paid by EuroSite Power.

About EuroSite Power

EuroSite Power Limited is a subsidiary of American DG Energy Inc. (NYSE MKT: ADGE). The Company provides institutional, commercial and small industrial facilities with clean, reliable power, cooling, heat and hot water at lower costs than charged by conventional energy suppliers – without any capital or start-up costs to the energy user. More information can be found at www.eurositepower.co.uk.

###

FORWARD-LOOKING STATEMENTS

This press release contains forward-looking statements under the Private Securities Litigation Reform Act of 1995 that involve a number of risks and uncertainties. Important factors could cause actual results to differ materially from those indicated by such forward-looking statements, as disclosed on the Company’s website and in Securities and Exchange Commission filings. This press release does not constitute an offer to buy or sell securities by the

Company, its subsidiaries or any associated party and is meant purely for informational purposes. The statements in this press release are made as of the date of this press release, even if subsequently made available by the Company on its website or otherwise. The Company does not assume any obligation to update the forward-looking statements provided to reflect events that occur or circumstances that exist after the date on which they were made.